
The Ghana Institution of Engineering (GhIE) has released a sobering assessment of the nation’s infrastructure, grading the overall state of public works as "D3" or "Poor to Fair" in its 2026 Infrastructure Report Card. With an overall score of 2.83 out of 5 (57%), the report underscores a chronic cycle of underfunding and poor maintenance that threatens national economic development. While the aviation sector emerged as the top performer with a C3 (71%) rating, experts warn that a staggering $1.2 billion in additional investment is required to meet future demand and solidify Ghana’s position as a regional aviation hub.
The assessment across eight critical sectors reveals a stark disparity in performance. Aviation's relatively strong showing is attributed to significant investments in the Kotoka International Airport and high safety standards; however, it still grapples with a significant 40% funding gap. In contrast, the road and railway sectors have reached critical lows, both receiving an E1 rating. The road network, in particular, plummeted to a 50% rating, a decline attributed to flood-related damage and systemic planning failures. Other sectors like electric power (66%) and telecommunications (64%) showed moderate ratings but remain hampered by financial challenges and low broadband penetration.
Contributing to the discourse on infrastructure longevity, Ing. Kwabena Bempong, a road construction consultant, emphasized that the deterioration of the road network is exacerbated by poor seasonal planning. He advocated for scheduling major works outside the rainy season and prioritizing robust drainage systems, such as cross culverts, to protect multi-million dollar investments from flood damage. The GhIE report echoes this concern, noting that no sector scored above a D1 in the funding category, highlighting a nationwide financial crisis that compromises the quality and lifespan of public assets.
To rectify these systemic issues, the GhIE is calling for the establishment of a National Infrastructure Council to oversee performance monitoring and ensure sustainable funding. Ing. Dr. Patrick Amoah Bekoe, Vice-President of the GhIE, stressed that closing the $1.2 billion aviation gap alone would require unprecedented collaboration between the government, private sector, and international development partners. Without a fundamental shift toward a proactive maintenance culture and strategic capital investment, the report warns that Ghana's infrastructure will continue to lag behind its economic aspirations.
This story touches markets covered on Anansi Intelligence ↗.
Live rates
Dollar to cedi rate →Continue exploring similar stories