
Ghana's national infrastructure has been classified as "Poor to Fair" following the release of the 2026 Infrastructure Report Card by the Ghana Institution of Engineering (GhIE). The report assigned the country an overall D3 rating (57%), highlighting a systemic financing crisis and significant maintenance gaps across eight critical sectors. While aviation emerged as the top performer with a C3 rating due to modernization at Kotoka International Airport, the road sector has plummeted to an E1 grade. This decline is largely attributed to mounting contractor arrears and persistent safety concerns, underscoring the urgent need for a National Infrastructure Council to oversee capital investment and asset management.
In the midst of these broader challenges, the reconstruction of the Accra-Tema Motorway is making tangible progress, reaching 48% completion according to project consultant Ing. Kwabena Bempong. A central component of this project is the development of an urban highway service road and extensive drainage infrastructure designed to mitigate chronic flooding. The project features approximately 20 culverts and three major interchanges, many of which are nearing completion. Despite the logistical hurdles of managing traffic diversions, engineers remain committed to keeping the motorway passable throughout the construction period to maintain the flow of commerce.
However, technical engineering solutions alone may not be enough to solve the country's infrastructure woes. Mr. Kofi Anokye, CEO of Koans Estate, has warned that recurring floods remain a severe threat to urban development due to poor planning and weak regulation enforcement. He argues that unsustainable land use and indiscriminate waste disposal often undermine drainage systems, regardless of their engineering quality. Anokye is calling for a paradigm shift toward responsible housing development and stricter adherence to urban planning regulations to protect economic stability and ensure the safety of citizens.
Ultimately, the convergence of the GhIE's report and the ongoing motorway works suggests a critical junction for Ghanaian development. While specific projects like the Accra-Tema Motorway demonstrate localized progress in flood management and road capacity, the broader infrastructure deficit requires a more sustainable financing model. Resolving contractor debts and implementing more rigorous urban planning will be essential to elevating Ghana's infrastructure from its current "poor" status to a level that can fully support the nation's long-term economic growth and resilience.
This story touches markets covered on Anansi Intelligence ↗.
Continue exploring similar stories